Well No. 612 Novo-kluchevskoye field, JSC "Samaraneftegaz"

In the period from 2 to 12 February, works on cutting out the "window" in the production string in well No. 612 Novo-kluchevskoye field, JSC "Samaraneftegaz". The work was carried out in a column with a diameter of 146/8mm depth 2240м. All work on the preparation of the wellbore, orientation of the diverter wedge and cutting "Windows" in a regular mode.

Оформить заказ
Отправить заявку


Схема проезда