The work on the well No. 25 Soviet deposits of JSC "Samaraneftegaz"

LLC "INNOIL", in conjunction with the drilling team of Vital, OOO cut a "window" in the range of 2750-2753м in the production string Ø168мм. All work is performed in normal mode. "With the new drilling rig IDEL-125 equipment and supplies, nice work!" said Dabihullin I. work on the well. Technical equipment of LLC "VITAL" showed successful result and work on cutting out the "window", easily done.

Автор: Dabihullin I.

Оформить заказ
Отправить заявку


Схема проезда