Well No. 133 Slavinskogo oil fields of OJSC "Samaraneftegaz"

The following works are performed: sabaniroo of the interval setting of the whipstock INKO-146, crimping tool drill, skrabirovanie the inner surface of the drill pipe, the BHA Assembly for cutting a "window", the slope and installing a whipstock oriented way and cutting "Windows" in the interval 1603м-1606м. All work is performed drill team LLC "Vital" under the careful supervision and engineering maintenance engineer-technologist LLC "INNOIL" Dabihullin I. "excellent".

 

Автор: Dabihullin I.

Оформить заказ
Отправить заявку


Схема проезда